01 — Installation
Installed so it can be maintained
Most maintenance problems are installation problems nobody wrote down.
- Load calculation first
Manual N and Manual CS before anything is ordered. Never what the truck had.
- Coordinated before a pipe is cut
Routing, clearances, service access and hangers agreed with the other trades.
- Passivated before it runs
Hydrostatic test, flush, chemical clean, neutralize, passivate. Then balanced, with an independent TAB report.
- Handed over with its numbers
As-builts, equipment IDs, QR tags and start-up readings. The building owns the data, not us.

stock
Isolation each side, gauges where you can read them, everything reachable. Installed to be serviced.
Brands we install and service
We are not tied to one manufacturer. We specify what the load calculation asks for, and we service what is already in your building.
Chillers & plantCarrier · Trane · York · Daikin Applied · Multistack
Cooling towersBAC · EVAPCO · Marley · Delta
BoilersLochinvar · AERCO · Weil-McLain · Raypak
PumpsGrundfos · Armstrong · Bell & Gossett · Taco
Heat exchangersAlfa Laval · Danfoss · API · Bell & Gossett
Water-source heat pumpsClimateMaster · Carrier · Trane · Daikin
Drives & controlsABB · Danfoss · Johnson Controls · Honeywell · Siemens
Split & VRFMitsubishi Electric · Daikin · LG · Fujitsu · Lennox
Rooftop & DOASAAON · Petra · Carrier · Trane
Water treatmentChemTreat · Chem-Aqua · Nalco Water